FAQs on Wastewater Treatment for Schools & Colleges

By Admin | July 4, 2025

Wastewater Treatment for Schools and Colleges

Schools and colleges in Varanasi and UP are now required to treat their wastewater before discharge or reuse. But many principals and admin teams still have questions about the process, rules, and costs.

Here, A2Z Enviro Services answers the most frequently asked questions (FAQs) from education clients in a simple, practical way.

Q1: Is STP/ETP really mandatory for schools and colleges?

Yes. As per the latest NGT orders and UP Pollution Control Board notifications, any school, college, or hostel above a certain strength (often 500 students+ or large campuses) must install a sewage treatment plant or effluent plant. This rule is strictly enforced for new buildings and renewals.

Q2: How much space is needed?

Modern STPs are available in compact, modular, and even underground versions. For a 30 KLD school, you may need just 50–70 sqm. A site survey will finalize requirements.

Q3: Is the treated water safe for reuse?

Yes. Treated water from a properly designed STP can be safely used for gardening, flushing toilets, and cleaning, saving 30–50% of the school’s fresh water bill.

Q4: What is the approximate cost for a school STP?

For a medium school or college, a 20–40 KLD STP usually costs ₹8–18 lakh, depending on design, technology, and local civil work. Annual maintenance is low and easy.

Q5: Is operation difficult? Who will run the plant?

Not at all! A2Z Enviro Services provides operator training, simple control panels, and AMC (Annual Maintenance Contract) for hassle-free operation. We also provide remote support for issues.

Q6: How can schools fund their STP?

Many schools use CSR funds, grants, or even green building subsidies. Plus, the water and compliance savings quickly pay for the investment within 2–3 years.

Why Choose A2Z Enviro Services?

Contact for School/College STP Consultation

Call: +91-9464488006 or WhatsApp for a free survey and proposal.

Frequently Asked Questions

Is it compulsory for schools and colleges to install STP/ETP?

Yes, as per NGT and pollution board norms, most educational institutions above a certain size must treat sewage and wastewater onsite in Varanasi and Uttar Pradesh.

How much space does an STP/ETP require for a school?

Compact and modular designs are available. For 20-50 KLD, you may need just 40-80 sqm. Underground options save surface space.

Can treated water be reused in schools/colleges?

Absolutely! Treated water is safe for gardening, flushing, and cleaning, reducing the need for fresh water.

What is the approximate cost of a school STP?

Cost depends on capacity and technology. A basic 20 KLD plant may cost ₹8–12 lakh, with low AMC and power costs. Contact A2Z Enviro Services for a custom quote.

💬